Legislature(2017 - 2018)SENATE FINANCE 532

02/09/2018 09:00 AM Senate FINANCE

Note: the audio and video recordings are distinct records and are obtained from different sources. As such there may be key differences between the two. The audio recordings are captured by our records offices as the official record of the meeting and will have more accurate timestamps. Use the icons to switch between them.

Download Mp3. <- Right click and save file as

* first hearing in first committee of referral
+ teleconferenced
= bill was previously heard/scheduled
+= SB 144 APPROP: OPERATING BUDGET/LOANS/FUNDS TELECONFERENCED
Heard & Held
David Teal, Director, Legislative Finance
Division
*+ SB 168 APPROP: SUPPLEMENTAL OP.; FUND; AMENDING TELECONFERENCED
Heard & Held
Pat Pitney, Director, Office of Management and
Budget
Neil Steininger, Chief Budget Analyst, Office of
Management and Budget
+ Bills Previously Heard/Scheduled: TELECONFERENCED
+= SB 143 APPROP: MENTAL HEALTH BUDGET TELECONFERENCED
Heard & Held
SENATE BILL NO. 168                                                                                                           
                                                                                                                                
     "An  Act making  supplemental appropriations  and other                                                                    
     appropriations; making  an appropriation  to capitalize                                                                    
     a fund;  amending appropriations; and providing  for an                                                                    
     effective date."                                                                                                           
                                                                                                                                
9:34:12 AM                                                                                                                    
                                                                                                                                
PAT  PITNEY,  DIRECTOR,  OFFICE OF  MANAGEMENT  AND  BUDGET,                                                                    
OFFICE OF  THE GOVERNOR, discussed the  FY 2018 Supplemental                                                                    
Summary  (copy on  file). She  announced that  she would  be                                                                    
discussing  the   supplemental  requests  included   in  the                                                                    
December  15, 2018  budget, at  which time  $170 million  in                                                                    
unrestricted general funds (UGF)  for supplementals had been                                                                    
requested.  She recalled  that the  CBR  threshold was  $200                                                                    
million additional  funds to accommodate  supplementals. She                                                                    
furthered that the January  29, 2018 supplementals requested                                                                    
$7.9  million  in  UGF, the  supplemental  bill  before  the                                                                    
committee   $5   million   below  the   January   29,   2018                                                                    
supplemental total.                                                                                                             
                                                                                                                                
9:35:43 AM                                                                                                                    
                                                                                                                                
Co-Chair  MacKinnon agreed  that  the spreadsheet  reflected                                                                    
the $5  million drop in  the total,  but that the  UGF spend                                                                    
had increased by $8 million.                                                                                                    
                                                                                                                                
Ms. Pitney  responded that  the UGF  was $170  million, plus                                                                    
the $7.9 million, she said  the administration would address                                                                    
each request line by line for clarity.                                                                                          
                                                                                                                                
9:36:38 AM                                                                                                                    
                                                                                                                                
Co-Chair MacKinnon  queried the  largest driver of  the $7.9                                                                    
million UGF request.                                                                                                            
                                                                                                                                
Ms. Pitney asked whether the  committee wished to begin with                                                                    
the December 15, 2018 supplementals  or the January 29, 2018                                                                    
supplemental requests.                                                                                                          
                                                                                                                                
9:37:06 AM                                                                                                                    
                                                                                                                                
Co-Chair  Hoffman directed  Ms. Pitney  to proceed  with her                                                                    
initial presentation  but noted that the  additional capital                                                                    
supplemental, totaling $6 million in  UGF, that had not been                                                                    
mentioned.                                                                                                                      
                                                                                                                                
9:37:20 AM                                                                                                                    
                                                                                                                                
NEIL STEININGER, CHIEF BUDGET  ANALYST, OFFICE OF MANAGEMENT                                                                    
AND BUDGET,  discussed the FY 2018  Supplemental Items (copy                                                                    
on file).                                                                                                                       
                                                                                                                                
Mr. Steininger looked at Lines 2 through 4:                                                                                     
                                                                                                                                
     Line 2                                                                                                                   
     UGF: $453.5                                                                                                                
     Total: $453.5                                                                                                              
     Administration                                                                                                             
     Public Defender Agency                                                                                                     
     Public Defense Support                                                                                                   
     The Agency experienced a reduction  in Criminal Rule 39                                                                    
     fee  revenue  in  FY2017,  and  this  is  projected  to                                                                    
     continue into FY2018 and FY2019.  An increase of $453.5                                                                    
     general  funds  is  necessary to  replace  the  reduced                                                                    
     program  receipt  revenue   and  to  maintain  staffing                                                                    
     levels                                                                                                                     
                                                                                                                                
     Line 3                                                                                                                   
     UGF: $10,447.6                                                                                                             
     Total: $10,477.6                                                                                                           
     Corrections                                                                                                                
     Institution Director's Office                                                                                              
     Add   Authority  to   Meet  Operational   Needs  Within                                                                  
     Institutions  Based  on  current  projections  and  the                                                                  
     offender population  trend, it is anticipated  that DOC                                                                    
     will  need a  supplemental for  FY2018 of  $10,447.6 to                                                                    
     meet institutional shortfalls.                                                                                             
                                                                                                                                
     Line 4                                                                                                                   
     UGF: $10,341.5                                                                                                             
     Total: $10, 341.5                                                                                                          
     Corrections                                                                                                                
     Physical Health Care                                                                                                       
     Increased  Costs for  Nursing Shortages,  Medical Fees,                                                                  
     Chronic Disease, and Pharmaceuticals                                                                                     
     The  Department of  Corrections (DOC)  is obligated  to                                                                    
     deliver   essential   medical  care   to   incarcerated                                                                    
     offenders under  AS 33.30.011(4). This  supplemental is                                                                    
     needed to  meet the increased inmate  health care costs                                                                    
     that      include      fees-for-service,      increased                                                                    
     pharmaceutical     costs,     increased     contractual                                                                    
     obligations  and   physical  health  care   staff  cost                                                                    
     overages due to overtime for medical coverage                                                                              
                                                                                                                                
Mr. Steininger highlighted Lines 5 through 7:                                                                                   
                                                                                                                                
     Line 5                                                                                                                   
     DGF: $400.0                                                                                                                
     Total: $400.0                                                                                                              
     Education and Early Development                                                                                            
     Mt. Edgecumbe Boarding School                                                                                              
     Operating  and Maintenance  of the  Mt. Edgecumbe  High                                                                  
     School Aquatic Center (FY18- FY19)                                                                                       
     An   appropriation  to   support  the   operations  and                                                                    
     maintenance  costs of  the  Mt.  Edgecumbe High  School                                                                    
     Aquatic  Center  from  its opening  in  FY2018  through                                                                    
     FY2019.                                                                                                                    
                                                                                                                                
     Line 6                                                                                                                   
     Total: 0                                                                                                                   
     Education and Early Development                                                                                            
     Executive Administration                                                                                                   
     Extend  Every  Student  Succeeds  Act  Support  Funding                                                                  
     Sec20 Ch2 4SSLA2016 P36 L21 (SB138) (FY17- FY19)                                                                         
     Extend  Every  Student  Succeeds  Act  Support  Funding                                                                    
     (ESSA) Sec20 Ch2 4SSLA2016  P36 L21 (SB138) (FY17-FY18)                                                                    
     into  FY19.  The  Department  of  Education  and  Early                                                                    
     Development is  still awaiting ESSA revisions  from the                                                                    
     Federal government  and is still in  the implementation                                                                    
     phase.  This extension  will  allow  the department  to                                                                    
     complete the implementation of ESSA.                                                                                       
                                                                                                                                
     Line 7                                                                                                                   
     UGF: $92,986.0                                                                                                             
     Total: $92,986.0                                                                                                           
     Health and Social Services                                                                                                 
     Health Care Medical Services                                                                                               
     Medicaid FY18 Projections                                                                                                
     While a  continued decrease in the  percentage of state                                                                    
     general   fund  spending   for   the  average   medical                                                                    
     assistance  recipient is  reported  between FY2016  and                                                                    
     FY2017,  the  enrollment   for  non-Medicaid  expansion                                                                    
     continues  to  increase   into  FY2018.  The  projected                                                                    
     general fund expenditures for  FY2018 is $664,233.9 and                                                                    
     after excluding  the request for CHIP,  a state general                                                                    
     fund shortfall of $92,986.0 is expected.                                                                                   
                                                                                                                                
9:39:28 AM                                                                                                                    
                                                                                                                                
Mr. Steininger  looked at  Line 8. He  stated that  when the                                                                    
budget was  crafted the Children's Health  Insurance Program                                                                    
(CHIP)  had  not  yet  been   reauthorized  by  the  federal                                                                    
government, the  item had been  included to  endure adequate                                                                    
funding for  the program. He  revealed that the  program had                                                                    
been reauthorized by the federal government.                                                                                    
                                                                                                                                
9:39:56 AM                                                                                                                    
                                                                                                                                
Mr. Steininger highlighted Line 9:                                                                                              
                                                                                                                                
     Line 9                                                                                                                   
     Total: 0                                                                                                                   
     Health and Social Services                                                                                                 
     Healthcare Medical Services                                                                                                
     Medicaid Federal Receipt Collections                                                                                     
     Though the  department is confident that  the amount of                                                                    
     federal   authority  in   FY2017  adequately   reflects                                                                    
     federal  revenues,  unanticipated changes  may  provide                                                                    
     for  opportunities   to  leverage   additional  federal                                                                    
     receipt authority.                                                                                                         
                                                                                                                                
9:40:10 AM                                                                                                                    
                                                                                                                                
Mr. Steininger discussed Line 10:                                                                                               
                                                                                                                                
     Line 10                                                                                                                  
     UGF: $18,000.0                                                                                                             
     Total: $18,000.0                                                                                                           
     Health and Social Services                                                                                                 
     HB Treatment and Recovery Grants                                                                                           
     Substance Use Disorder Grants (FY18-21)                                                                                  
     This four-year grant  program is a response  to a clear                                                                    
     and urgent need to  expand substance use disorder (SUD)                                                                    
     services by  addressing gaps in  the continuum  of care                                                                    
     identified  by local  communities. Access  to treatment                                                                    
     will improve public  safety as well as  help parents to                                                                    
     unify with their children more effectively.                                                                                
                                                                                                                                
9:40:33 AM                                                                                                                    
                                                                                                                                
Co-Chair Hoffman asked  Mr. Steininger to speak  to the need                                                                    
for the multi-year appropriation.                                                                                               
                                                                                                                                
Mr. Steininger  responded that the  multi-year appropriation                                                                    
ran from  FY 18 to  FY 21 and would  allow for time  for the                                                                    
actual providers  to build capacity for  services. He stated                                                                    
that  the build  up for  capacity would  take more  than one                                                                    
fiscal year.                                                                                                                    
                                                                                                                                
9:41:11 AM                                                                                                                    
                                                                                                                                
Senator  von  Imhof  wondered  whether  the  line  item  was                                                                    
related to new regulations pertaining to autism.                                                                                
                                                                                                                                
Mr.  Steininger  replied  that  the  funding  would  not  be                                                                    
associated  with   autism  but  would  be   targeted  toward                                                                    
substance use disorders. He added  that the funds would help                                                                    
to address the opioid epidemic.                                                                                                 
                                                                                                                                
9:41:39 AM                                                                                                                    
                                                                                                                                
Senator von Imhof  understood that the $18  million would be                                                                    
distributed over the course of 4 years.                                                                                         
                                                                                                                                
Mr. Steininger replied in the affirmative.                                                                                      
                                                                                                                                
9:42:03 AM                                                                                                                    
                                                                                                                                
Senator  von  Imhof wondered  why  the  funds needed  to  be                                                                    
funded up  front, rather than  requesting $4.5  million each                                                                    
year, over the next 4 years.                                                                                                    
                                                                                                                                
Mr.  Steininger responded  that  having the  $18 million  up                                                                    
front, and  guaranteeing the funding over  4 years, provided                                                                    
certainty  to  providers  who  would   be  building  up  the                                                                    
capacity for services.                                                                                                          
                                                                                                                                
9:42:24 AM                                                                                                                    
                                                                                                                                
Senator  von Imhof  surmised that  there was  flexibility in                                                                    
the  number. She  stated that  she understood  the need  for                                                                    
providers to have assurances of funding.                                                                                        
                                                                                                                                
9:42:51 AM                                                                                                                    
                                                                                                                                
Senator Micciche  felt that the request  was unusual because                                                                    
supplemental requests  had typically covered  past spending.                                                                    
He noted  that the  line item bridged  the past,  four years                                                                    
into the future.                                                                                                                
                                                                                                                                
Ms. Pitney replied that the choice  to add the line item had                                                                    
been a  conscious one, the  item had  added in an  effort to                                                                    
expedite the grant  process. She stressed that  the item was                                                                    
linked to  public safety and  was meant to help  address the                                                                    
state's lack of substance abuse treatment programs.                                                                             
                                                                                                                                
9:44:29 AM                                                                                                                    
                                                                                                                                
Co-Chair Hoffman  asked whether the distribution  amount per                                                                    
community had been identified.                                                                                                  
                                                                                                                                
Ms.  Pitney   agreed  to   provide  that   information  from                                                                    
Department of Health and Social Services (DHSS).                                                                                
                                                                                                                                
9:45:16 AM                                                                                                                    
                                                                                                                                
Mr. Steininger highlighted Lines 11 and 12:                                                                                     
                                                                                                                                
     Line 11                                                                                                                  
     UGF: $322.0                                                                                                                
     Total: $322.0                                                                                                              
     Special Appropriations                                                                                                     
     Judgements, Claims & Settlements                                                                                           
     DEC Wage and Hour Settlement                                                                                             
     Wage and  hour settlement  as a result  of a  June 2017                                                                    
     arbitration                                                                                                                
                                                                                                                                
     Line 12                                                                                                                  
     Total: 0                                                                                                                   
     Special Appropriations                                                                                                     
     Judgements, Claims & Settlements                                                                                           
     Judgements and Settlements                                                                                               
     Judgements and  settlements against  the state  for the                                                                    
     fiscal year ending  June 30, 2018, but  not included in                                                                    
     sec 16(a).                                                                                                                 
                                                                                                                                
9:45:33 AM                                                                                                                    
                                                                                                                                
Mr. Steininger addressed Line 13:                                                                                               
                                                                                                                                
     Line 13                                                                                                                  
     UGF: $94.1                                                                                                                 
     Total: $94.1                                                                                                               
     Military and Veterans Affairs                                                                                              
     Office of the Commissioner                                                                                                 
     Add  Special   Assistant  (09-#011)  to   Preserve  and                                                                  
    Protect Department of Defense Investment in Alaska                                                                        
     Add   one   full-time    Special   Assistant   to   the                                                                    
     Commissioner  (PCN:  09-#011)  in  the  Office  of  the                                                                    
     Commissioner.  This  position  is part  of  a  coherent                                                                    
     engagement  strategy with  Department of  Defense (DOD)                                                                    
     and  other key  stakeholders  (federal military  senior                                                                    
     officials,   Congressional   Delegation,   local   base                                                                    
     retention  groups,  and  members   of  the  public)  to                                                                    
     preserve, protect, and  potentially grow DOD investment                                                                    
     in the State of Alaska.                                                                                                    
                                                                                                                                
9:45:51 AM                                                                                                                    
                                                                                                                                
Senator von Imhof asked whether this position should have                                                                       
existed all along to advocate for military investment in                                                                        
Alaska.                                                                                                                         
                                                                                                                                
Ms.  Pitney replied  that the  because of  budget reductions                                                                    
the  position  had  been  eliminated.   She  said  that  the                                                                    
administration believed  that the position was  critical and                                                                    
needed to be reinstated.                                                                                                        
                                                                                                                                
9:47:13 AM                                                                                                                    
                                                                                                                                
Senator von  Imhof commented  that current  employees should                                                                    
already be working on the issue.                                                                                                
                                                                                                                                
9:47:55 AM                                                                                                                    
                                                                                                                                
Vice-Chair  Bishop  requested more  detail  on  the Line  11                                                                    
item.                                                                                                                           
                                                                                                                                
9:48:04 AM                                                                                                                    
                                                                                                                                
Co-Chair MacKinnon  addressed Line 11 and  noted that Alaska                                                                    
had  suffered from  not having  arbitration guidelines.  She                                                                    
wondered  whether the  administration  would be  introducing                                                                    
legislation that provided guidelines for arbitration.                                                                           
                                                                                                                                
Ms. Pitney agreed to provide that information.                                                                                  
                                                                                                                                
9:48:32 AM                                                                                                                    
                                                                                                                                
Co-Chair   MacKinnon    felt   that   the    Department   of                                                                    
Administration would need to  advance an arbitration policy.                                                                    
She  noted that  state finances  scrutinized by  arbitrators                                                                    
included the permanent fund  earnings reserve account, which                                                                    
had not  been used for  funding before, but  was continually                                                                    
used in  arbitration against the state.  She felt guidelines                                                                    
that  precluded the  earnings reserve  would  result in  the                                                                    
state winning more arbitration cases.                                                                                           
                                                                                                                                
Co-Chair MacKinnon  pointed to  Line 13,  she asked  why the                                                                    
item was supplemental, rather than in the Operating Budget.                                                                     
                                                                                                                                
Ms.  Pitney replied  that the  administration felt  that the                                                                    
position was  important enough to request  as a supplemental                                                                    
item.                                                                                                                           
                                                                                                                                
9:50:00 AM                                                                                                                    
                                                                                                                                
Co-Chair  MacKinnon questioned  the  level of  risk of  lack                                                                    
military  investment   during  a   time  when   the  federal                                                                    
government was  increasing military  presence in  the state.                                                                    
She wondered  whether the request  was necessary  now, given                                                                    
the economic crisis facing the state.                                                                                           
                                                                                                                                
9:50:51 AM                                                                                                                    
                                                                                                                                
Senator Micciche spoke of the  process and his role as chair                                                                    
of the  budget subcommittee  for the Department  of Military                                                                    
and  Veteran's   Affairs.  He  was  disappointed   with  the                                                                    
addition of the position in the supplemental budget.                                                                            
                                                                                                                                
Co-Chair   Hoffman  wondered   whether   the  position   was                                                                    
currently filled.                                                                                                               
                                                                                                                                
Ms. Pitney believed that it was but wanted to double check.                                                                     
                                                                                                                                
9:52:17 AM                                                                                                                    
                                                                                                                                
Co-Chair Hoffman strongly  suggested that the administration                                                                    
should  not  fill  positions  that   were  requested  in  as                                                                    
supplemental until  the supplemental  was approved.  He felt                                                                    
that  filling  the  positions  ahead  of  procuring  funding                                                                    
usurped the voice of the legislature in the matter.                                                                             
                                                                                                                                
9:53:03 AM                                                                                                                    
                                                                                                                                
Vice-Chair Bishop  commented that  military spending  on the                                                                    
federal  level  had  been increased  by  approximately  $500                                                                    
million very recently.                                                                                                          
                                                                                                                                
9:53:41 AM                                                                                                                    
                                                                                                                                
Co-Chair MacKinnon  expressed frustration  that supplemental                                                                    
requests from  the administration were "out  of control" and                                                                    
that the desires of the legislature were being ignored.                                                                         
                                                                                                                                
9:55:03 AM                                                                                                                    
                                                                                                                                
Mr. Steininger addressed Line 14:                                                                                               
                                                                                                                                
     Line 14                                                                                                                  
     UGF: $221.0                                                                                                                
     Federal Receipts: $663.0                                                                                                   
     Total: $884.0                                                                                                              
     Military and Veteran's Affairs                                                                                             
     Air Guard Facilities Maintenance                                                                                           
     Increase Federal Authority and GF Match Associated                                                                       
     with C-17 Acquisition                                                                                                    
     Increased  federal receipt  authority and  General Fund                                                                    
     matching  funds  for facilities  operations/maintenance                                                                    
     for  three buildings  supporting C-17  operations. Five                                                                    
     full-time   positions  were   created   in  Air   Guard                                                                    
     Facilities   Maintenance   to  operate   and   maintain                                                                    
     facilities gained to support the C-17 aircraft.                                                                            
                                                                                                                                
9:55:34 AM                                                                                                                    
                                                                                                                                
Mr. Steininger highlighted Line 15:                                                                                             
                                                                                                                                
     Line 15                                                                                                                  
     UGF: $350.0                                                                                                                
     Total: $350.0                                                                                                              
     Special Appropriations                                                                                                     
     Klutina Lake Road Survey                                                                                                   
     Klutina Lake Road Survey (FY18-FY20)                                                                                     
     In  an effort  to  ensure  that the  State  is able  to                                                                    
     provide for the public's  ability to continue using the                                                                    
     road  to  access  outdoor activities  while  respecting                                                                    
     Ahtna's  concerns  surrounding   potential  impacts  to                                                                    
     private   property  rights,   and  land   and  resource                                                                    
     management, survey activities will  be performed by the                                                                    
     Department.                                                                                                                
                                                                                                                                
9:55:50 AM                                                                                                                    
                                                                                                                                
Co-Chair MacKinnon recalled that  the state attorney general                                                                    
had  negotiated a  settlement  surrounding  the road  access                                                                    
that had been  rejected by the corporation.  She wondered if                                                                    
the funds were related to the settlement.                                                                                       
                                                                                                                                
Ms.  Pitney responded  that the  funds were  related to  the                                                                    
overall  area,   and  were  not  directly   related  to  the                                                                    
settlement, but would be helpful  for eventual resolution of                                                                    
the settlement.                                                                                                                 
                                                                                                                                
9:56:52 AM                                                                                                                    
                                                                                                                                
Co-Chair MacKinnon  asked whether the survey  benefitted the                                                                    
state or the corporation.                                                                                                       
                                                                                                                                
Ms. Pitney replied  that the survey would  clarify the legal                                                                    
descriptions surrounding land use in the area.                                                                                  
                                                                                                                                
9:57:42 AM                                                                                                                    
                                                                                                                                
Co-Chair  Hoffman wondered  whether  there  was an  existing                                                                    
dispute  between the  corporation  and the  state about  the                                                                    
width of the right-of-way on  the property. He believed that                                                                    
the  dispute was  not about  access -  but the  size of  the                                                                    
access.                                                                                                                         
                                                                                                                                
Ms. Pitney  answered that  she would  need to  get specifics                                                                    
from the Department of Law.                                                                                                     
                                                                                                                                
9:58:35 AM                                                                                                                    
                                                                                                                                
Mr. Steininger looked at Line 16:                                                                                               
                                                                                                                                
     Line 16                                                                                                                  
     DGF: $30,000.0                                                                                                             
     Total: $30,000.0                                                                                                           
     Fund Capitalization                                                                                                        
     Community Assistance Fund                                                                                                  
     FY2018 Deposit from the Power Cost Equalization Fund                                                                     
     In  FY2017, the  Power  Cost  Equalization Fund  earned                                                                    
     $112,330,514.  After   following  the  formula   in  AS                                                                    
     42.45.085(d),    $55,464,300     is    available    for                                                                    
     appropriation  to  the  Community Assistance  Fund  and                                                                    
     rural  energy programs.  $30,000,000 will  be deposited                                                                    
     in    the   community    assistance    fund   per    AS                                                                    
     42.45.085(d)(2)(A).                                                                                                        
                                                                                                                                
9:58:50 AM                                                                                                                    
                                                                                                                                
Mr. Steininger addressed Line 17:                                                                                               
                                                                                                                                
     Line 17                                                                                                                  
     Total: 0                                                                                                                   
     Fund Capitalization                                                                                                        
     AK LNG Fund                                                                                                                
     Deposit Investments  into Alaska Liquefied  Natural Gas                                                                  
     Fund AGDC  expects to receive investments  from outside                                                                  
     parties  as  it continues  to  develop  the Alaska  LNG                                                                    
     project.  Investment funding  will support  the project                                                                    
     as  it  contracts  with engineering,  procurement,  and                                                                    
     construction   (EPC)   firms    to   conduct   frontend                                                                    
     engineering and design  and lump-sum turn-key estimates                                                                    
     prior to  a final investment decision  in calendar year                                                                    
     2019.                                                                                                                      
                                                                                                                                
9:59:06 AM                                                                                                                    
                                                                                                                                
Senator von  Imhof looked  at Line 17  and noted  that there                                                                    
was not a  current fiscal note associated  with the request.                                                                    
She  wondered  whether  granting the  request  was  "blanket                                                                    
permission" to allow  Alaska Gasline Development Corporation                                                                    
(AGDC) to  accept any investment  money that  arrived during                                                                    
the  next fiscal  year. She  asked  whether the  legislature                                                                    
would be able  to review the money coming in  and probed the                                                                    
need for the particular line item.                                                                                              
                                                                                                                                
Ms. Pitney  responded that SB 138,  which established AGDC's                                                                    
rules  of  operation  and corporate  status,  established  a                                                                    
board to oversee corporation, and  established the powers of                                                                    
both. She shared that the  budget authority would allow AGDC                                                                    
to   accept  investments   from   third   parties  for   the                                                                    
development  of   the  gasline.  She  reiterated   that  the                                                                    
boundaries  of  the  corporation's powers  were  written  in                                                                    
statue and that approval of  investment was through the AGDC                                                                    
board. She  said that if  every third party who  invested in                                                                    
the  gasline  had  to  be  vetted  through  the  legislative                                                                    
process it would  be difficult for investors  to feel secure                                                                    
about moving a project forward.                                                                                                 
                                                                                                                                
10:01:54 AM                                                                                                                   
                                                                                                                                
Senator  von Imhof  worried that  passage of  the line  item                                                                    
would remove a layer of legislative oversight.                                                                                  
                                                                                                                                
10:02:53 AM                                                                                                                   
                                                                                                                                
Mr. Steininger highlighted Lines 18 and 19:                                                                                     
                                                                                                                                
     Line 18                                                                                                                  
     Other Amount: $12,000.0                                                                                                    
     Total: $12,000.0                                                                                                           
     Fund Capitalization                                                                                                        
     AK LNG Fund                                                                                                                
     Transfer from In-State Natural Gas Pipeline Fund                                                                         
     At  the  conclusion of  FY2018  it  will no  longer  be                                                                    
     necessary  to  have  two separate  funds:  1229  Alaska                                                                    
     Gasline  Development  Corporation     Instate  Pipeline                                                                    
     (AGDC-ISP)   and   1235  Alaska   Gasline   Development                                                                    
     Corporation   Liquefied  Natural Gas (AGDC-LNG). Moving                                                                    
     the balance of fund 1229  AGDC-ISP into fund 1235 AGDC-                                                                    
     LNG  will streamline  AGDC's administrative  and budget                                                                    
     processes and match the Governor's direction.                                                                              
                                                                                                                                
     Line 19                                                                                                                  
     Other Funds: ($12,000.0)                                                                                                   
     Total: ($12,000.0)                                                                                                         
     Fund Capitalization                                                                                                        
     In-State Pipeline Fund                                                                                                     
     Transfer to Liquefied Natural Gas Project Fund                                                                           
     At  the  conclusion of  FY2018  it  will no  longer  be                                                                    
     necessary  to  have  two separate  funds:  1229  Alaska                                                                    
     Gasline  Development  Corporation     Instate  Pipeline                                                                    
     (AGDC-ISP)   and   1235  Alaska   Gasline   Development                                                                    
     Corporation   Liquefied  Natural Gas (AGDC-LNG). Moving                                                                    
     the balance of fund 1229  AGDC-ISP into fund 1235 AGDC-                                                                    
     LNG  will streamline  AGDC's administrative  and budget                                                                    
     processes and match the Governor's direction.                                                                              
                                                                                                                                
10:03:15 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Line 20:                                                                                               
                                                                                                                                
     Line 20                                                                                                                  
     DGF: $14,000.0                                                                                                             
     Total: $14,000.0                                                                                                           
     Fund Transfers                                                                                                             
     Renewable Energy Grant Fund                                                                                                
     FY2018 Deposit from the Power Cost Equalization Fund                                                                     
     In  FY2017, the  Power  Cost  Equalization Fund  earned                                                                    
     $112,330,514.  After   following  the  formula   in  AS                                                                    
     42.45.085(d),    $55,464,300     is    available    for                                                                    
     appropriation  to  the  Community Assistance  Fund  and                                                                    
     rural  energy programs.  $14,000,000 will  be deposited                                                                    
     in   the   Renewable   energy   Grant   Fund   per   AS                                                                    
     42.45.085(d)(2)(B).   Additional    funding   will   be                                                                    
     allocated to projects in the Capital Budget.                                                                               
                                                                                                                                
10:03:26 AM                                                                                                                   
                                                                                                                                
Mr. Steininger addressed Line 21:                                                                                               
                                                                                                                                
     Line 21                                                                                                                  
     UGF: $23,918.2                                                                                                             
     Total: $23,918.2                                                                                                           
     Fund Transfers                                                                                                             
     Marine Highway System Fundighway                                                                                           
     FY2018 Deposit from the General Fund                                                                                     
     Of the  $30 million appropriated from  the general fund                                                                    
     to the  Alaska Marine  Highway System fund  for FY2018,                                                                    
     only $6,081,800  was available to  transfer due  to the                                                                    
     associated  contingent   language.  This  appropriation                                                                    
     back-fills the short fall.                                                                                                 
                                                                                                                                
                                                                                                                                
10:03:38 AM                                                                                                                   
                                                                                                                                
Co-Chair MacKinnon remarked that  she had worked on Alaska's                                                                    
Renewable   Energy  Advisory   Team.  She   looked  to   the                                                                    
relationship between  Line 16  and Line  20. She  noted that                                                                    
the  administration  was spending  $44  million  of the  $55                                                                    
million  available, she  wondered whether  the addition  $11                                                                    
million had been used elsewhere in the budget.                                                                                  
                                                                                                                                
Mr. Steininger replied in the affirmative. He relayed that                                                                      
the funds had been used in the Capital Budget.                                                                                  
                                                                                                                                
10:04:50 AM                                                                                                                   
                                                                                                                                
Mr. Steininger readdressed Line 21.                                                                                             
                                                                                                                                
10:04:58 AM                                                                                                                   
                                                                                                                                
Mr. Steininger highlighted Line 24:                                                                                             
                                                                                                                                
     Line 24                                                                                                                  
     Other Amount: $8,125.0                                                                                                     
     Total: $8,125.0                                                                                                            
     Commerce                                                                                                                   
     Capital                                                                                                                    
     Alaska Energy Authority - Volkswagen Settlement                                                                          
     The Environmental Mitigation  Trust established as part                                                                    
     of  the   Volkswagen  (VW)  Settlement   is  explicitly                                                                    
     intended  for   funding  Eligible   Mitigation  Actions                                                                    
     (Appendix   D-2  of   Environmental  Mitigation   Trust                                                                    
     Agreement)  to  fully   mitigate  the  total,  lifetime                                                                    
     excess  NOx emissions  from the  2.0L and  3.0L subject                                                                    
     vehicles. Alaska  has been allocated $8.125  million to                                                                    
     fund  eligible actions  over the  next  ten years.  The                                                                    
     consent   decree   requires   the  development   of   a                                                                    
     Beneficiary Mitigation Plan  (Plan) that summarizes how                                                                    
     the  funds will  be  used to  provide  the public  with                                                                    
     insight into  the State's high-level vision  for use of                                                                    
     the   mitigation  funds   and  information   about  the                                                                    
     specific uses for funding.                                                                                                 
                                                                                                                                
10:05:17 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Line 25:                                                                                               
                                                                                                                                
     Line 25                                                                                                                  
     UGF: $6,000.0                                                                                                              
     Total: $6,000.0                                                                                                            
     Transportation                                                                                                             
     Capital                                                                                                                    
     Alaska  Marine Highway  System Vessel  Overhaul, Annual                                                                  
     Certification and Shoreside Facilities Rehabilitation                                                                    
     The  Alaska  Marine   Highway  System  (AMHS)  requires                                                                    
     annual  maintenance  and  overhaul on  vessels  and  at                                                                    
     terminals,  particularly  components or  systems  whose                                                                    
     failures  impact  service  in the  short  term.  Annual                                                                    
     overhaul of vessels is necessary  to pass United States                                                                    
     Coast   Guard   (USGS)   inspections   and   obtain   a                                                                    
     Certificate  of Inspection  (COI) necessary  to operate                                                                    
     in  revenue service.  Expenses  for annual  maintenance                                                                    
     exceeded   annual  budgeted   amounts  in   FY2017  and                                                                    
     projected  for  FY2018.  This supplemental  allows  the                                                                    
     AMHS  to  accomplished   required  maintenance  without                                                                    
     impacting route service.                                                                                                   
                                                                                                                                
10:05:35 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman understood that Line 25 contained the only                                                                     
Capital Budget appropriation request.                                                                                           
                                                                                                                                
Ms. Pitney clarified that it was the UGF Capital Budget                                                                         
request.                                                                                                                        
                                                                                                                                
10:05:54 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Line 28:                                                                                               
                                                                                                                                
     Line 28                                                                                                                  
     Total: 0                                                                                                                   
     Environmental Conservation                                                                                                 
     Capital                                                                                                                    
     Reapprop   for   Municipal  Matching   Grants   Project                                                                  
     Administration - NTE $200,000                                                                                            
     The    Department    of   Environmental    Conservation                                                                    
     anticipates   completed   Municipal   Matching   Grants                                                                    
     projects  to  lapse  roughly $440,000  at  the  end  of                                                                    
     FY2018. Department  costs to administer  these projects                                                                    
     is unpredictable  and can  exceed the  amount available                                                                    
     in  the appropriations  for administrative  costs. When                                                                    
     that happens,  these costs must shift  to the operating                                                                    
     budget which  has been significantly reduced  in recent                                                                    
     years.  This reappropriation  ensures sufficient  funds                                                                    
     are  available to  administer  the remaining  Municipal                                                                    
     Matching Grant appropriations.                                                                                             
                                                                                                                                
10:06:20 AM                                                                                                                   
Mr. Steininger highlighted Line 29:                                                                                             
                                                                                                                                
     Line 29                                                                                                                  
     Total: 0                                                                                                                   
     Transportation                                                                                                             
     Capital                                                                                                                    
     Reapprop for Adak Airport  Maintenance and Operations -                                                                  
     Est $742,604                                                                                                             
     In  2003,  the  Department   of  the  Navy  transferred                                                                    
     ownership of the  Adak airport to the  State. The state                                                                    
     was  given a  $10.0 million  for operating  the airport                                                                    
     with the  understanding that no additional  funds would                                                                    
     be  provided.   The  original  $10.0  million   is  now                                                                    
     exhausted  and  must  be replaced  by  another  funding                                                                    
     source.  This  project,   along  with  a  corresponding                                                                    
     FY2019 capital appropriation,  will provide gap funding                                                                    
     while  the  department  engages  with  stakeholders  to                                                                    
     develop  a  strategic  action   plan  for  funding  the                                                                    
     airport in the future.                                                                                                     
                                                                                                                                
10:06:49 AM                                                                                                                   
                                                                                                                                
Mr. Steininger addressed Line 30:                                                                                               
                                                                                                                                
     Line 30                                                                                                                  
     Total: 0                                                                                                                   
     Transportation                                                                                                             
     Capital                                                                                                                    
     Reapprop   for  the   Commuter  Rail   Concept  -   Est                                                                  
     $4,541,537                                                                                                               
     The   unexpended  and   unobligated  balances   of  the                                                                    
     appropriations made in sec. 10,  ch. 29, SLA 2008, page                                                                    
     76, lines  25 - 26, as  amended by sec. 16(b),  ch. 38,                                                                    
     SLA  2015  (Department  of  Transportation  and  Public                                                                    
     Facilities,  Glenn Highway  rut repairs  - $11,500,000)                                                                    
     and sec.  1, ch.  18, SLA  2014, page  63, line  4, and                                                                    
     allocated  on page  63, lines  12 -  13, as  amended by                                                                    
     secs.  14(d)  and 27(g)  and  (h),  ch. 1,  TSSLA  2017                                                                    
     (Department  of Transportation  and Public  Facilities,                                                                    
     economic   development,   Knik   Arm   Bridge   project                                                                    
     development), estimated  to be  a total  of $4,541,537,                                                                    
     are reappropriated to  the Department of Transportation                                                                    
     and Public Facilities for the commuter rail concept.                                                                       
                                                                                                                                
10:07:04 AM                                                                                                                   
                                                                                                                                
Senator  von Imhof  asked whether  there  had been  previous                                                                    
studies on the commuter rail concept.                                                                                           
                                                                                                                                
Ms. Pitney  responded that there were  multiple studies, and                                                                    
the  governor had  established a  task force  to review  the                                                                    
reports.                                                                                                                        
                                                                                                                                
10:08:04 AM                                                                                                                   
                                                                                                                                
Senator  von Imhof  surmised that  much  of the  engineering                                                                    
groundwork had  been completed if previous  studies had been                                                                    
done. She wondered what the funds would be spent on.                                                                            
                                                                                                                                
Ms.  Pitney replied  that the  plan  was to  have the  funds                                                                    
support the rail extension and operations.                                                                                      
                                                                                                                                
10:08:55 AM                                                                                                                   
                                                                                                                                
Senator   von  Imhof   understood   that   the  item   could                                                                    
potentially  be  in  the  Capital   Budget  to  support  the                                                                    
building of rails and spurs and train operation.                                                                                
                                                                                                                                
Ms. Pitney replied in the affirmative.                                                                                          
                                                                                                                                
10:09:25 AM                                                                                                                   
                                                                                                                                
Co-Chair MacKinnon looked at Line  30, she asked how many at                                                                    
grade crossings needed to be changed.                                                                                           
                                                                                                                                
Ms. Pitney responded that the  intent was to use the primary                                                                    
existing rail between Anchorage  and Wasilla. She reiterated                                                                    
that the project was a Capital Budget project.                                                                                  
                                                                                                                                
10:10:16 AM                                                                                                                   
                                                                                                                                
Co-Chair  MacKinnon  asked  whether the  administration  had                                                                    
reviewed the past studies on the rail link.                                                                                     
                                                                                                                                
Ms.  Pitney  said  that  she had  not.  She  clarified  that                                                                    
employees  of the  Department of  Transportation and  Public                                                                    
Works had  reviewed the  studies and  would be  working with                                                                    
the task force                                                                                                                  
                                                                                                                                
10:10:39 AM                                                                                                                   
                                                                                                                                
Co-Chair  MacKinnon  knew that  the  idea  was popular.  She                                                                    
revealed that  the rider fee  of $10 each direction  had not                                                                    
been favored  by the  public. She  opined that  the proposal                                                                    
would put  a commuter rail  on a track that  carried gravel.                                                                    
She  wondered  whether an  analysis  had  been done  on  the                                                                    
displacement  of payloads  with  passengers. She  recognized                                                                    
that the idea  was popular but worried that the  cost to the                                                                    
commuter would  be high, while  other freight that  would be                                                                    
more  beneficial  to the  railroad  be  profitable would  be                                                                    
displaced.                                                                                                                      
                                                                                                                                
10:13:03 AM                                                                                                                   
                                                                                                                                
Senator von  Imhof wondered whether  it would make  sense to                                                                    
present   the  committee   with   the   project  after   the                                                                    
feasibility  was  updated  to address  Co-Chair  MacKinnon's                                                                    
concerns.                                                                                                                       
                                                                                                                                
Ms.  Pitney stated  that the  task force  and the  DOT staff                                                                    
would be happy  to have the discussion  with the legislature                                                                    
soon.                                                                                                                           
                                                                                                                                
10:14:38 AM                                                                                                                   
                                                                                                                                
Mr. Steininger highlighted Line 34:                                                                                             
                                                                                                                                
     Line 34                                                                                                                  
     DGF: $103.4                                                                                                                
     Total: $103.4                                                                                                              
     Commerce, Community, and Economic Development                                                                              
     Banking Securities                                                                                                         
     Financial Examiner I/II for Alaska Native Claims                                                                         
     Settlement Act Filings and Support                                                                                       
     The  division  must   timely  process  ANCSA  corporate                                                                    
     filings and  respond to  complaints within  10 business                                                                    
     days.  Without this  position,  the  division would  be                                                                    
     forced  to reduce  resources  tasked with  examinations                                                                    
     and enforcement activities for other programs.                                                                             
                                                                                                                                
10:15:12 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman asked whether  the programs and the program                                                                    
receipts had been vetted by the ANCSA corporations.                                                                             
                                                                                                                                
Mr. Steininger  responded that the corporations  had seen an                                                                    
increase in  collections because  of an increase  in filings                                                                    
and in complaints.                                                                                                              
                                                                                                                                
Co-Chair Hoffman thought that the issue warranted further                                                                       
discussion off of the record.                                                                                                   
                                                                                                                                
10:16:00 AM                                                                                                                   
                                                                                                                                
Co-Chair MacKinnon asked whether it was typical to see so                                                                       
many positions being added in a supplemental budget.                                                                            
                                                                                                                                
Co-Chair Hoffman replied that, to his knowledge, no.                                                                            
                                                                                                                                
10:16:15 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Lines 35 through 37:                                                                                   
                                                                                                                                
     Line 35                                                                                                                  
     DGF: $35.0                                                                                                                 
     Total: $35.0                                                                                                               
     Environmental Conservation                                                                                                 
     Solid Waste Management                                                                                                     
     Increase Program Receipt Authority                                                                                       
     The  Solid Waste  Management  program  conducted a  fee                                                                    
     study  in FY2017.  Revised  fee  regulations have  gone                                                                    
     through public  notice, review,  and comment,  and were                                                                    
     enacted  effective  October  27, 2017.  The  Department                                                                    
     anticipates  revenue  from  the new  fees  will  exceed                                                                    
     general fund program receipt authority in FY2018.                                                                          
                                                                                                                                
     Line 36                                                                                                                  
     DGF: ($35.0)                                                                                                               
     Total: ($35.0)                                                                                                             
     Environmental Conservation                                                                                                 
     Air Quality                                                                                                                
     Decrease Program Receipt Authority                                                                                       
     The Division  of Air Quality  expects to  under collect                                                                    
     general fund  program receipt  authority in  FY2018 due                                                                    
     to fluctuations  in the amount  of Title I  permit work                                                                    
     from year to year.                                                                                                         
                                                                                                                                
     Line 37                                                                                                                  
     Federal Amount: $6,500.0                                                                                                   
     Total: $6,500.0                                                                                                            
     Health and Social Services                                                                                                 
     Front Line Social Workers                                                                                                  
     Public Assistance Cost Allocation Plan Amendment                                                                         
     A  recent  amendment  to  the  section  of  the  Public                                                                    
     Assistance  Cost Allocation  Plan (PACAP)  covering the                                                                    
     Office  of Children's  Services changes  the allocation                                                                    
     methodology   for  the   Front   Line  Social   Workers                                                                    
     component,  the  largest  personal  services  component                                                                    
     within the  Office of  Children's Services  budget. The                                                                    
     estimated  increase is  associated  primarily with  the                                                                    
     claiming for the Title IV-E  foster care, adoption, and                                                                    
     guardianship programs.                                                                                                     
                                                                                                                                
10:17:14 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman noted that time was running short and                                                                          
requested that members submit further questions to the                                                                          
administration in writing.                                                                                                      
                                                                                                                                
10:17:37 AM                                                                                                                   
                                                                                                                                
Mr. Steininger highlighted Line 38:                                                                                             
                                                                                                                                
     Line 38                                                                                                                  
     UGF: $1,000.0                                                                                                              
     Total: $1,000.0                                                                                                            
     Health and Social Services                                                                                                 
     Foster Care Base Rate                                                                                                      
     Decline in Child Support Payment Collections                                                                             
     The Office  of Children's Services  expects significant                                                                    
     reductions in  collections of child support  and social                                                                    
     security payments.                                                                                                         
                                                                                                                                
10:18:05 AM                                                                                                                   
Mr. Steininger addressed Line 39:                                                                                               
                                                                                                                                
     Line 39                                                                                                                  
     UGF: $2,895.7                                                                                                              
     Total: $2,895.7                                                                                                            
     Health and Social Services                                                                                                 
     Foster Care Special Need                                                                                                   
     FY2017 Special Need Payments Made in FY2018                                                                              
     At  the  close  of  FY2017  the  Office  of  Children's                                                                    
     Services  pushed payments  for FY2017  obligations into                                                                    
     FY2018 in the amount of $2,895.7.                                                                                          
                                                                                                                                
Mr. Steininger looked at Line 40:                                                                                               
                                                                                                                                
     Line 40                                                                                                                  
     UGF: $2,000.0                                                                                                              
     Total: $2,000.0                                                                                                            
     Health and Social Services                                                                                                 
     Alaska Temporary Assistance Program                                                                                        
     Temporary Assistance for  Needy Families Maintenance of                                                                  
     Effort                                                                                                                   
     The  maintenance  of  effort (MOE)  for  the  Temporary                                                                    
     Assistance for Needy  Families (TANF) program, mandated                                                                    
     by  the Federal  Government,  is primarily  met by  the                                                                    
     expenditures   within   ATAP.    The   state   received                                                                    
     notification  of penalty  for failure  to meet  the MOE                                                                    
     obligation for federal fiscal year 2017.                                                                                   
                                                                                                                                
10:19:13 AM                                                                                                                   
                                                                                                                                
Mr. Steininger highlighted Line 41:                                                                                             
                                                                                                                                
     Line 41                                                                                                                  
     Other Amount: $5,000.0                                                                                                     
     Total: $5,000.0                                                                                                            
     Revenue                                                                                                                    
     APFC Investment Management Fees                                                                                            
     Investment and Custody Fees                                                                                              
     Unanticipated  market  performance or  manager  changes                                                                    
     could cause  the actual amount  of fees paid  to exceed                                                                    
     projections. As  a prudent  course of  action, $5,000.0                                                                    
     supplemental  authority for  the Investment  Management                                                                    
     Fee  allocation will  ensure that  APFC has  sufficient                                                                    
     funds to meet our contractual obligations.                                                                                 
                                                                                                                                
10:19:32 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Line 44:                                                                                               
                                                                                                                                
     Line 44                                                                                                                  
     DGF: ($25,000.0)                                                                                                           
     Total: ($25,000.0)                                                                                                         
     Special Appropriation                                                                                                      
     Comprehensive Insurance Program                                                                                            
     Payment from Premera to the Reinsurance Program                                                                          
     Adjustment to  the state  contribution to  the calendar                                                                    
     year 2017 reinsurance  program to reflect reimbursement                                                                    
     from Premera Blue Cross Blue Shield.                                                                                       
                                                                                                                                
10:19:53 AM                                                                                                                   
                                                                                                                                
Mr. Steininger looked at Line 45:                                                                                               
                                                                                                                                
     Line 45                                                                                                                  
     UGF: $2,000.0                                                                                                              
     Total: $2,000.0                                                                                                            
     Fund Capitalization                                                                                                        
     Disaster Relief Fund                                                                                                       
     Disaster Relief Funding                                                                                                  
     This increase is  needed due to the low  balance of the                                                                    
     disaster relief  fund and  the estimated  amount needed                                                                    
     for  spring  2018  disasters. Sufficient  general  fund                                                                    
     authority of $2,000,000 currently  exists in the FY2019                                                                    
     budget.                                                                                                                    
                                                                                                                                
10:20:13 AM                                                                                                                   
                                                                                                                                
Mr. Steininger addressed Line 46:                                                                                               
                                                                                                                                
     Line 46                                                                                                                  
     Total: 0                                                                                                                   
     Salary and Benefit Adjustments                                                                                             
     University of Alaska Bargaining Unit Agreements                                                                          
     The Fairbanks  Firefighters Union, IAFF Local  1324 and                                                                    
     the   United  Academics   -  American   Association  of                                                                    
     University Professors, American  Federation of Teachers                                                                    
     both  negotiated contracts  effective in  FY2018. These                                                                    
     contracts  did   not  have  monetary   terms  requiring                                                                    
     supplemental appropriation.                                                                                                
                                                                                                                                
Lines  47  through 49  listed  the  Funding Summary  Jan  29                                                                    
Operating  Language Section,  Total of  Jan 29  Supplemental                                                                    
requests,   and  Grand   Total   of  Supplemental   Requests                                                                    
($217,835.0).                                                                                                                   
                                                                                                                                
10:21:17 AM                                                                                                                   
                                                                                                                                
Mr. Steininger addressed Line 51 through 57, which listed                                                                       
January 29, 2018 ratifications in whole dollars:                                                                                
                                                                                                                                
     Line 51                                                                                                                  
     UGF: $467,693.27                                                                                                           
     Total: $467,693.27                                                                                                         
     Health and Social Services                                                                                                 
     Pioneer Homes                                                                                                              
     FY2016, AR H001 Alaska Pioneer Homes                                                                                     
                                                                                                                                
     Line 52                                                                                                                    
     UGF: $1,350,310.26                                                                                                         
     Total: $1,350,310.26                                                                                                       
     Health and Social Services                                                                                                 
     Public Health                                                                                                              
     FY2016, AR H007 Public Health                                                                                            
                                                                                                                              
     Line 53                                                                                                                  
     UGF: $8,715,670.72                                                                                                         
     Total: $8,715,670.72                                                                                                       
     Health and Social Services                                                                                                 
     Medicaid Services                                                                                                          
     FY2016, AR H012 Medicaid Services                                                                                        
                                                                                                                              
     Line 54                                                                                                                  
     UGF: $8,824.49                                                                                                             
     Total: $8,824.49                                                                                                           
     Health and Social Services                                                                                                 
     Capital                                                                                                                    
     FY2010, AR H264 Mental Health Housing                                                                                    
                                                                                                                                
     Line 55                                                                                                                    
     UGF: $7,355.06                                                                                                             
     Total: $7,355.06                                                                                                           
     Health and Social Services                                                                                                 
     Capital                                                                                                                    
     FY2011, AR H260 Mental Health Home Modification and                                                                      
     Upgrades to Retain Housing                                                                                               
                                                                                                                                
10:22:02 AM                                                                                                                   
                                                                                                                                
Mr. Steininger discussed Line 56:                                                                                               
                                                                                                                                
     Line 56                                                                                                                  
     UGF: $300,310.83                                                                                                           
     Total: $300,310.83                                                                                                         
     Health and Social Services                                                                                                 
     Capital                                                                                                                    
     FY2016, AR HUBC Unbudgeted Capital RSA's                                                                                 
                                                                                                                                
10:22:14 AM                                                                                                                   
                                                                                                                                
Mr. Steininger looked at Line 57:                                                                                               
                                                                                                                                
     Line 57                                                                                                                  
     UGF: $4,304,930.00                                                                                                         
     Total: $4,304,930.00                                                                                                       
     Public Safety                                                                                                              
     Bureau of Highway Patrol                                                                                                   
     AR 47863-13 Bureau of Highway Patrol  Special Project                                                                    
                                                                                                                                
10:22:37 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman  queried the meaning of  the ratifications,                                                                    
and    the   legislative    process   for    approving   the                                                                    
ratifications.                                                                                                                  
                                                                                                                                
Mr.  Steininger replied  that ratifications  were shortfalls                                                                    
in  the restrictions  of the  budget. The  figures reflected                                                                    
reimbursements  that  departments   had  expected  from  the                                                                    
federal government  in FY 16,  which were  either disallowed                                                                    
or reimbursed at a lower rate than expected.                                                                                    
                                                                                                                                
10:24:24 AM                                                                                                                   
                                                                                                                                
Ms. Pitney  furthered that, from  an audit  perspective, the                                                                    
ratification  was  the  process   used  to  clean  up  audit                                                                    
findings.  She  noted  that the  Bureau  of  Highway  Patrol                                                                    
ratification was an  issue that stemmed from  2011. She said                                                                    
that there had  been attempts by the  legislature to address                                                                    
the issue in 2013, but it  remained an audit finding and now                                                                    
required the ratification.                                                                                                      
                                                                                                                                
10:25:22 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman queried additional detail to Line 44.                                                                          
                                                                                                                                
Mr.  Steininger replied  that at  the end  of calendar  year                                                                    
2017,  Premera  Blue  Cross Blue  Shield  had  provided  $25                                                                    
million  to   the  Alaska  Comprehensive   Health  Insurance                                                                    
Association for  paying claims  on the  reinsurance program.                                                                    
He  said that  the  $25 million  reduced  the obligation  of                                                                    
state funds  needed to cover  the program for  calendar year                                                                    
2017, which resulted in the  $25 million reduction reflected                                                                    
on Line 44.                                                                                                                     
                                                                                                                                
10:26:39 AM                                                                                                                   
                                                                                                                                
Co-Chair Hoffman discussed housekeeping.                                                                                        
                                                                                                                                
SB  168  was  HEARD  and   HELD  in  committee  for  further                                                                    
consideration.                                                                                                                  
                                                                                                                                

Document Name Date/Time Subjects
020918 FY2018 Supplemental Summary and Detail.pdf SFIN 2/9/2018 9:00:00 AM
SB 168
SB 168 FY2018 Supplemental Summary.pdf SFIN 2/9/2018 9:00:00 AM
SB 168
SB 168 FY2018 Supplemental Backup.pdf SFIN 2/9/2018 9:00:00 AM
SB 168
SB 144 D operating budget.pdf SFIN 2/9/2018 9:00:00 AM
SB 144
SB 144 Summary of Changes from the Gov to CSSB 144(FIN).pdf SFIN 2/9/2018 9:00:00 AM
SB 144
SB 144 ver A to D from Leg Legal 1 30 18 CS Zero.pdf SFIN 2/9/2018 9:00:00 AM
SB 144
SB 143 work draft version D.pdf SFIN 2/9/2018 9:00:00 AM
SB 143
SB 143 Summary of Changes from the Gov to CSSB143(FIN).pdf SFIN 2/9/2018 9:00:00 AM
SB 143
SB 143 ver A to D from Leg Legal 1 30 18 CS Zero.pdf SFIN 2/9/2018 9:00:00 AM
SB 143